Cerchio (AQ)
Wind Farm site in Collarmele. In the Velino-Sirente Regional Park, with a revamping of the wind farm in the Collarmele-Cerchio district, the largest wind farm in Abruzzo was installed. The old single blade wind turbines were replaced with 2 MW machines to reach 12 MW of power. 6 farms were installed.
Location: Cerchio (AQ)
6 (2 MW) Wind Turbines | Installed Capacity: 12 MW
Year built: 2008
DETAILS
- Client: Town of Cerchio
- Type of installation: Wind Turbine Installation/ Connection to Grid
- Categories: Wind Power
- Year: 2008