Collarmele (AQ) – II

Wind Farm site in Collarmele. In the Velino-Sirente Regional Park, with a revamping of the wind farm in the Collarmele-Cerchio district, the largest wind farm in Abruzzo was installed. The old single blade wind turbines were replaced with 2 MW machines to reach 12 MW of power. 6 farms were installed.

Location: Collarmele (AQ) – II “Monte Coppetella”
2 (2 MW) Wind Power GeneratorsInstalled Capacity: 4 MW
Year built: 2008

Visualize on Google Maps

Collarmele (AQ) – II “Vallone”

2 (2 MW) Wind Power Generators | Installed Capacity: 4 MW
Year built: 2008

Visualize on Google Maps

Collarmele (AQ) – II “La Giortanda”
2 (2MW) Wind Power Generators | Installed Capacity:4 MW
Year built: 2008

Visualize on Google Maps

DETAILS

  • Client: Comune di Collarmele
  • Type of installation: Installazione Pale Eoliche/ Allaccio Elettrico
  • Categories:
  • Year: 2008
VISUALIZE ON GOOGLE MAPS

TAGS