Cerchio (AQ)

Wind Farm site in Collarmele. In the Velino-Sirente Regional Park, with a revamping of the wind farm in the Collarmele-Cerchio district, the largest wind farm in Abruzzo was installed. The old single blade wind turbines were replaced with 2 MW machines to reach 12 MW of power. 6 farms were installed.

Location: Cerchio (AQ)
6 (2 MW) Wind Turbines  | Installed Capacity: 12 MW
Year built: 2008

 

DETAILS

  • Client: Town of Cerchio
  • Type of installation: Wind Turbine Installation/ Connection to Grid
  • Categories:
  • Year: 2008
VISUALIZE ON GOOGLE MAPS

TAGS