Collarmele (AQ) – II
Wind Farm site in Collarmele. In the Velino-Sirente Regional Park, with a revamping of the wind farm in the Collarmele-Cerchio district, the largest wind farm in Abruzzo was installed. The old single blade wind turbines were replaced with 2 MW machines to reach 12 MW of power. 6 farms were installed.
Location: Collarmele (AQ) – II “Monte Coppetella”
2 (2 MW) Wind Power Generators | Installed Capacity: 4 MW
Year built: 2008
Collarmele (AQ) – II “Vallone”
2 (2 MW) Wind Power Generators | Installed Capacity: 4 MW
Year built: 2008
Collarmele (AQ) – II “La Giortanda”
2 (2MW) Wind Power Generators | Installed Capacity:4 MW
Year built: 2008
DETAILS
- Client: Comune di Collarmele
- Type of installation: Installazione Pale Eoliche/ Allaccio Elettrico
- Categories: Wind Power
- Year: 2008